A practical 12-field AEC project setup checklist for turning a won proposal into a ready-to-work job with clear ownership, files, permissions and billing.

THE WON-JOB HANDOFF

Signed is not the same as ready.

Winning a project is a commercial milestone. Starting it cleanly is an operating decision. Before the first deliverable, your team needs a shared answer to five questions: What was approved? Who owns delivery? Where do files live? Who gets access? How does billing work?

When these decisions live in different inboxes, project setup becomes guesswork. This field guide turns the handoff into a repeatable, 12-field record and four approvals.

The operating principle

One approved project start record before anyone provisions the job. Software can implement decisions. It should not make them.

Where the handoff breaks

A proposal describes what a firm intends to deliver. The project team needs something more precise: a unique job number, an accountable manager, an authoritative file location, a collaborator list, and accounting instructions. If those decisions do not travel together, the first invoice, coordination meeting, or change order may expose the gap.

SalesAccepted scope, exclusions, and contract version
DeliveryProject manager, milestones, and file structure
FinanceJob code, billing owner, and approval rules
IT & securityWorking systems, permissions, and outside access

You do not need another application to solve this. You need a decision record that your current tools can follow. Autodesk’s project setup guidance, Procore’s project setup steps, and Microsoft SharePoint permission guidance each illustrate part of the workflow. None can identify your firm’s commercial decision-maker for you.

THE PRACTICAL CHECKLIST

The 12-field Project Start Record

Keep this as one controlled handoff card in your CRM, project register, or intake workflow. Each field needs a named answer, a reference, or an approved exception, not a novel.

  1. 01
    Project identity

    Project name and unique job number

    Use the same approved identifier for time, tasks, files, and invoices; define how phases are handled.

  2. 02
    Contracting party

    Legal entity and customer

    Confirm the contracting entity and whether this is a new project, change order, or new phase.

  3. 03
    Commercial approval

    Approved scope and proposal version

    Link the accepted contract or scope, including exceptions; do not rely on a stale email attachment.

  4. 04
    Business owner

    Project executive or sponsor

    Name the person accountable for business decisions and exceptions.

  5. 05
    Delivery owner

    Project manager and backup

    Name the primary PM and who takes over when they are unavailable.

  6. 06
    Financial setup

    Billing owner, cost code, and approvals

    Record how expenses and time are coded and who approves purchases and scope changes.

  7. 07
    Delivery clock

    Milestones and start conditions

    Capture the first committed deliverable and the dependencies required to begin.

  8. 08
    Single source

    System of record for working files

    Specify the actual workspace or project URL, not merely ‘the shared drive.’

  9. 09
    File discipline

    Folder and naming standard

    Use approved structures for drawings, models, contracts, correspondence, and deliverables.

  10. 10
    Internal access

    Access by role

    Decide who can edit, review, approve, and administer; avoid unrestricted access.

  11. 11
    External access

    Collaborators and invitation approval

    Name outside parties, what they can access, and who approves invitations.

  12. 12
    End-of-job plan

    Closeout and transition owner

    Assign archiving, retention, final handoff, and removal of unnecessary access.

Rule: An empty field is an unmade decision. Assign its owner before kickoff rather than inventing a placeholder.

BEFORE KICKOFF

Four approval gates, in order

01 / COMMERCIAL

Confirm what was sold

Leadership approves scope, contracting entity, job number, and billing rules.

02 / OPERATIONS

Assign the team

The PM accepts ownership, backup coverage, milestones, and the working file standard.

03 / ACCESS

Authorize collaboration

The accountable owner confirms internal roles and external collaborator permissions.

04 / CONTINUITY

Make it repeatable

Record the backup owner, authoritative location, retention plan, and closeout path.

Then ask somebody who was not involved in the sale to locate the approved scope, job number, workspace, billing contact, and access approver. If they have to reconstruct an email chain, the project is not ready.

PUT IT TO WORK

Test one project before automating ten.

Pilot the start record on your next approved job. Note each unanswered field, who resolved it, and which setup actions can safely be templated. For projects with shared drawings, models, and field records, use the construction project documentation technology risk checklist alongside this guide.

The AEC Technology Operating Model explains how these decisions mature as your firm grows. To find the highest-impact gaps in your current environment, start with a Technology Gap Review.

This is an original operating framework, not an industry survey or an undisclosed client case study.